1963 | Founded under the name of Cellofoam Deutschland GmbH |
1976 | Cellofoam buys a hot-embossing machine and extends its business activities to include “technical noise control” |
1980 | Relocation to the newly built production hall on Freiburger Strasse in Biberach |
1984-90 | Several expansion projects at the new site increase the available surface for production and storage to 8,000 m², plus office space |
1997 | Management buyout by the two general managers: Helmut Rehlen and Jürgen Roellinghoff |
2002 | Jörg Roellinghoff buys the company shares held by Helmut Rehlen |
2004 | Foundation of a Cellofoam subsidiary in Turkey |
2006 | Additional production and storage hall (4,400 m²) built at the Biberach headquarters |
Installation of a profile cutting machine for producing a wide range of profiles; purchase of a new 3D water-jet cutting machine | |
2007 | Start of the new business activity “non-woven molding” |
Cellofoam workforce exceeds 100 | |
Installation of a new system for equipping our materials with self-adhesive backing | |
2008 | Foundation of the soniflex business - our Web Shop serving private customers and small commercial operations |
Setup of an in-company reverberation room for acoustic measurements | |
2009 | Foundation of Cellofoam CZ s.r.o. in the Czech Republic |
Gaskets and adhesive tapes included in our product range | |
2010 | Introduction of a flame treatment machine for processing parts made from EPP |
Cellofoam takes over the non-woven molding business of Eurofoam | |
2011 | New offices and production hall (4,000 m²) built for Cellofoam Turkey |
Development of an innovative product that combines insulation and drainage functions: Cello® DRAIN | |
2013 | New annex to Biberach headquarters built to accommodate additional offices and meeting rooms |
2014 | Formal opening of the new 4,000 m²+ production hall in the Czech Republic |
Cellofoam adds pipe insulation products to its range | |
2015 | Construction and opening of an additional production hall in Ochsenhausen near Biberach |
Product range expanded to include vibration damping material | |
2016 | Purchase and start-up of a new impregnation system for soft foams |
New product development: compressor blanket wrap with high noise absorption efficacy | |
Purchase of a thermal conductivity meter | |
2017 | Foundation of a distribution joint venture in Poland |
Purchase of a hot-lamination equipment for PE foams and non-wovens | |
2018 | Foundation of a distribution joint venture in France |
Construction of a new production hall (4,000m²) in Ochsenhausen | |
Purchase of a large die-cutter and press (300 t) | |
Foundation of a joint venture in China for the local production of noise-control materials | |
2019 | New management: Holger Stehling follows Jörg Roellinghoff as general manager of Cellofoam GmH & Co. KG |
2020 | Purchase of a milling machine for the production of 2D + 3D parts with absolutely accurate contours used as packaging inserts, protective packaging, transport packaging etc. |
2022 | Construction and opening of a third production hall at the Ochsenhausen site |
Purchase of an additional cutting system (cutter) | |
Commissioning of a melamine impregnation system at the Ochsenhausen site | |
2023 | Construction of a further warehouses at the Cellofoam site in the Czech Republic |
Acquisition and commissioning of a drying chamber for melamine foams | |
Purchase of two additional high-performance cutters | |
New addition to our machinery pool: a hotmelt system | |
Acquisition of a splitting machine | |
2024 | Construction of yet another production hall site with approx. 3.500 m² at our Ochsenhausen |
Acquisition and commissioning of a drying chamber for melamine foams |